Mission-Mod Blog House Walls Go Up

By | Custom Home Construction, Custom Home Design, Mission-Mod Blog House, Uncategorized, Video Episodes | No Comments
The walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction. For more on the builder, go to www.imyourbuilder.com

The walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction.

This week the Mission-Mod Blog House began to take shape as the walls went up on the first floor of this 4,600 square foot custom home designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. This is a good time to talk about the engineering of masonry block construction (also known as CMU). In certain parts of Florida, building code requires that the first floor of a home be constructed out of masonry block filled with reinforced concrete.

The walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction. For more on the builder, go to www.imyourbuilder.com

The walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction. For more on the builder, go to www.imyourbuilder.com

Masonry block alone does not carry the weight of the home. It must be filled with rebar (steel rods) and concrete inside the cells of the block for the walls to support the structure of the home. The way masonry block behaves structurally is by lining up the cells and filling them with reinforced concrete every four feet and at every opening in the home to create a series of vertical concrete columns that will carry the structural load from above.

Masonry block walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri.  THe masonry block (also known as CMU)  will be filled with reinforced concrete. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction. For more on the builder, go to www.imyourbuilder.com

Masonry block walls go up on the Mission-Mod Blog House designed and under construction by Orlando Custom Homebuilder Jorge Ulibarri. THe masonry block (also known as CMU) will be filled with reinforced concrete. Subscribe to the blog www.tradesecrestbyjorge.com and follow the progress of this custom home as we offer tips to master the learning curve of custom construction. For more on the builder, go to www.imyourbuilder.com

At the top of the masonry block walls are lentil blocks installed that have U-shaped openings. These line up with the adjacent masonry block and will be filled with reinforced concrete to create a horizontal, continuous beam around the perimeter of the home. Next, work begins on framing the second floor of the home. Workers also will create a cast-in-place radius beam over the front door that will be filled with concrete to carry the weight of the tower entry.

Click the video below to watch a recap of the Mission-Mod Blog House construction process thus far:

Check back again next week as we document the structural frame work for the second floor.

Mission-Mod Blog Home Concrete Foundation Pour

By | Custom Home Construction, Custom Home Design, Uncategorized | No Comments
Concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida.

Concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida.

Foundation work is complete on the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri.  The dirt floor underwent a termite treatment and was covered in plastic to prep for the concrete foundation pour.

The dirt foundation is prepped with a termite treatment and covered in plastic in advance of the concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida. for more, go to www.imyourbuilder.com

The dirt foundation is prepped with a termite treatment and covered in plastic in advance of the concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida. for more, go to www.imyourbuilder.com

The 4,600 square foot home’s foundation sits four inches above the finished floor elevation. Notice that the tower entry sits even higher at 14 inches above the finished floor elevation to accommodate steps leading to the front door for a grand entrance.

 

 

Before the concrete pour, you can see around the perimeter of the home’s foundation, deep trenches with reinforced steel rods. These trenches are called footers and they are 20 inches deep and will be filled with concrete to anchor the load bearing walls of the home.

Because the home has an open floor plan, the footers are a few inches deeper than in a typical home foundation. Since there are fewer load bearing walls in the home, the footers have to be super stable to support few walls that will carry the structural load.

The concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. The foundation required 11 trucks of concrete. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida. for more, go to www.imyourbuilder.com

The concrete foundation pour at the Mission-Mod Blog House under construction by Orlando Custom Home Builder Jorge Ulibarri. The foundation required 11 trucks of concrete. Follow the step-by-step process as we document the construction of this 4,600 square foot custom home located in Heathrow, Florida. for more, go to www.imyourbuilder.com

Next, the concrete block walls go up, so stay tuned as we offer tips on the masonry phase of construction. For more, go to www.ImYourBuilder.com

 

 

 

The Mission-Mod Blog House Groundwork Begins

By | Custom Home Construction, Custom Home Design, Mission-Mod Blog House, Uncategorized | No Comments

Laying the Groundwork For the Mission-Mod Blog House:

The Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home. Follow the step-by-step construction of this home as Orlando Custom Home Builder Jorge Ulibarri helps you master the learning curve of custom home construction.

The Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home. Follow the step-by-step construction of this home as Orlando Custom Home Builder Jorge Ulibarri helps you master the learning curve of custom home construction.

 

This week, groundwork is underway on the Mission-Mod Blog House by Orlando Custom Builder Jorge Ulibarri in advance of the concrete foundation pour. Here’s what happens in this phase:

Groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

Groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

The installation of the underground electrical and plumbing systems of the home.

Groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

Groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

Placement of the steel reinforcements for the footings. Remember that footings are sections of the concrete foundation that are larger and deeper to carry the weight loads of the home.

Steel reinforcements for the footers of the foundation as groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

Steel reinforcements for the footers of the foundation as groundwork begins on the Mission-Mod Blog House located in the gated community of Heathrow, Heathrow, Florida. Orlando Custom Home Builder Jorge Ulibarri designed the home and is constructing the 4,600 square foot home.

Termite treatment of the foundation

Now, here a few tips to consider in this phase of new home construction:

Before the concrete slab is poured, it’s a good idea to review your electrical outlet locations and make sure that you have ample floor outlets for lamps, technology, a piano etc. in spaces such as the living room, family room and office.

Check the location of the main electrical panel that will be located on exterior wall. Make sure on the opposite side of that wall, in your interior living space, that the exterior panel is not near a bed. Some clients have concerns about electro-magnetic fields produced by the power running through the panel. It is best to avoid placing the exterior panel on the opposite wall of where a bed would be located.

Stay tuned this week as we lay the foundation of the Mission-Mod Blog House and offer tips for this important step in new home construction.

Mission-Mod Blog House Foundation Work Begins

By | Custom Home Construction, Custom Home Design, Mission-Mod Blog House, Uncategorized | No Comments

Follow the Mission-Mod Blog House for a Step-By-Step Tutorial on the Custom Construction Process

The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

The next phase of construction of the Mission-Mod Blog House by Orlando Custom Home Builder Jorge Ulibarri requires soil testing of the lot. This should happen before the concrete forms are laid out for the foundation and the underground work begins. Two soil tests are necessary: Proctor and Density. These two tests will provide the builder with information on the type of soils the lot contains and how compact the soils are. Compaction results of 95 percent or better are suitable for construction.

Foundation forms for The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

Foundation forms for The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

Next, the concrete foundation and underground work begins. Due to the existing grading conditions of the lot, the builder decided to do a monolithic foundation which consists of the footings and the slab in a single pour versus a stem wall in which the footers are poured and a masonry wall is constructed and then the slab poured on top of that. If your lot is on a hill or sloping terrain, a stem wall foundation is required. Since this particular lot is flat, it accommodates a monolithic foundation, which is less expensive (a cost savings of approximately 30 percent).

The concrete foundation contractor places the forms around the perimeter of the house including the garage and sets the forms at the proper elevation.

Foundation forms for The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

Foundation forms for The Mission-Mod Blog House under construction by Orlando Custom HomeBuilder Jorge Ulibarri of Jorge Ulibarri Custom Homes. Follow the blog for a step by step guide to the process of custom home construction. For more information, go to www.imyourbuilder.com

Next, the plumber and the electrician “pull strings” (string the locations) to figure out where pipes electrical conduits will be located with respect to the walls and plumbing and fixtures. Also in this phase, the plumber will do the underground work for the mechanical contractor, which is placing conduits for the copper lines necessary for the air conditioning units. This form serves as a grid to guide the underground work. Stay tuned for our next post as the Mission-Mod Blog House undergoes its concrete foundation pour.